Tag Archives: well a & b

BP Probably Removed The BOP with The Bent Riser and Installed It on Well A Several Weeks After the 20th April Blowout.

BP probably removed the BOP with the bent riser and installed it on Well A several weeks after the 20th April blowout. It was only after the BOP installation on Well A, were video footage of the leaking BOP released for public consumption. Irrespective of the BOP’s “travel paths or transit points”, Well A could not have been the well location drilled by DWH when the 20th April blowout occurred. Period! Continue reading

Posted in Situation Update | Tagged , , , | Leave a comment